My Biggest Project Yet!
One of the elders at my church had a large warehouse space for his business that only had a small section of offices, but they needed more office space. He hired me to turn this wasted space between the existing offices and the bathroom into two new office spaces and a break room.
This project involved it all… Framing, insulation, drywall, window installation, door installation, paint, new flooring, and trim work. Luckily, they found other people to do the plumbing, electrical, emergency sprinklers, and drop ceilings, but the rest was all done by me!
This project is by far my biggest to date and I’m so proud of how it turned out!
Before
Before
After about 3-4 days of work
After about a week! The windows on the right belonged to one office space, while the doorway on the left led to the other. The doorway in the corner was a hallway that led to the break room and bathrooms.
After 2 weeks... Drywall was all up!
After 2 weeks... Drywall was all installed (with a lot of leftover scraps!)
After about 4 weeks, the drywall mud and painting was FINALLY completed.
After about 4 weeks, the drywall mud and painting was FINALLY completed.
The finished product!
The finished product!